What do our special projects have in common? Only the fact that at Barnard unique challenges are addressed through creative yet practicable solutions. Whether an owner requires early input from our engineers and superintendents to ensure that a project is constructible yet affordable or creative contracting necessary to allow a good idea to take physical shape, we have a solution. Let us contribute to your unusual building projects.

Project List
Owens Lake Dust Mitigation Project Phase 8

Location: Lone Pine, California
Owner: Los Angeles Department of Water and Power (LADWP)
Engineer: LADWP
Completion Date: September 2012
Removal of Elwha and Glines Canyon Dams

Location: Port Angeles, Washington
Owner: National Park Service
Engineer: U.S. Bureau of Reclamation
Completion Date: Currently under construction
Snoqualmie Falls Hydroelectric Redevelopment

Location: Snoqualmie, Washington
Owner: Puget Sound Energy, Inc.
Engineer: Klohn Crippen Berger
Completion Date: Currently under construction
Wanapum Dam Future Unit Infill Project

Location: Beverly, Washington
Owner: Grant County Public Utility District
Engineer: Hatch Acres
Completion Date: July 2010
Owens Lake Dust Mitigation – 7 Projects

Location: Lone Pine, California
Owner: Los Angeles Department of Water and Power
Engineer: CDM, CH2M Hill, Boyle Engineering
Completion Date: 7 projects between September 2000 & September 2012
Oswego Lake Interceptor Sewer Replacement Project (CM/GC: Preconstruction Phase Services)

Location: Lake Oswego, Oregon
Owner: City of Lake Oswego
Engineer: Brown and Caldwell
Completion Date: 2008
Round Butte Dam Selective Water Withdrawal

Location: Madras, Oregon
Owner: Portland General Electric Company
Engineer: CH2MHill
Completion Date: December 2009
Lake Mead Intake No. 1 Modifications

Location: Las Vegas, Nevada
Owner: Southern Nevada Water Authority
Engineer: MWH/CH2MHill
Completion Date: July 2004
Cornell Lake Source Cooling Project

Location: Ithaca, New York
Owner: Cornell University
Engineer: Gryphon International Engineering Services
Completion Date: November 1999 (6 months ahead of schedule)
North Outfall Sewer Rehabilitation Modifications

Location: Los Angeles, California
Owner: City of Los Angeles
Engineer: City of Los Angeles
Completion Date: August 1998