Barnard rehabilitated an existing toe drain by installing 90,000 LF of perforated HDPE pipe wrapped in geonet fabric using a sliplining process. Barnard's patentable technique for installing the pipe saved the Owner considerable money, risk, and time. This project required extensive dewatering and groundwater control. Excavation in loose, saturated sand was required at approximately 50 locations.