Martin Plant Cooling Pond Underdrain Rehabilitation
Project Type:
Pipelines & Utilities
Location: Martin County, Florida
Owner: Florida Power & Light Company
Engineer: CDM
Contract Value: $8.3 million
Contract Type: Fixed Unit Price (competitive bid)


Project Photos
*Click on thumbnail to enlarge

Project Highlights
  • 90,000 LF of 8-inch HDPE sliplining
  • TV/video inspection and logging of 90,000 LF of host pipe
  • Cleaning and pigging 90,000 LF of host pipe
  • High groundwater table
  • Dewatering system design and installation
  • Modifications to 26 lift stations
  • Innovative construction techniques

Project Details

Barnard rehabilitated an existing toe drain by installing 90,000 LF of perforated HDPE pipe wrapped in geonet fabric using a sliplining process. Barnard's patentable technique for installing the pipe saved the Owner considerable money, risk, and time. This project required extensive dewatering and groundwater control. Excavation in loose, saturated sand was required at approximately 50 locations.