West Leg Water Treatment Transmission & Associated Pipelines |
 |
 |
Pipelines & Utilities
Location: Scottsdale, Arizona
Owner: City of Scottsdale, Arizona
Engineer: Stanley Consultants, Inc.
Contract Value: $30.1 million
Contract Type: Fixed Unit Price (competitive bid)
 |  |  |  | |
| *Click on thumbnail to enlarge |
- 10,500 LF of 42-inch WSP
- 32,967 LF of 36-inch WSP
- 3,974 LF of 30-inch WSP
- 2,900 LF of 36-inch DIP
- 11,721 LF of 20-inch DIP
- 16,818 LF of 16-inch DIP
- 15,965 LF of 12-inch DIP
- 1,109 LF of 8-inch DIP
- 2,045 LF of 4-inch DIP
- Open-cut excavations in excess of 30 feet deep
Barnard's part in the West Leg Water Transmission Pipelines Project involved laying roughly 15 miles of pipe along or under busy Scottsdale, Arizona, streets. The project, which provides the delivery of potable water, required setting the pipes in very deep trenches, sometimes as deep as 30 feet. In some of the trenches, Barnard installed up to five additional pipelines. The job entailed working through a major power corridor with high voltage overhead lines. The steel pipe, varying in size from 30 inches to 42 inches, was placed during the hot months of spring and summer.
|
 |
“Beyond their high capabilities as a general contractor, what has impressed me most about Barnard is their trademark ability to form a cohesive team with the Owner and Engineer and their ability to find solutions to the problems that arise in construction.” - Chuck Hill, Construction Coordinator, City of Scottsdale, Arizona |
 |
|
|
|
|
|
|
|
|
|
 |
 |
|
|
|
|